Believable Operation

More thoughts and a few Practical Achievements

by Tony Newton


Introduction

In my article of Vol 7 No 4, Summer 2001, I gave my thoughts on operating a layout in some sort of prototypical fashion that could help members get a bit more out of their modeling.

A few things have moved on since then and some of the progress is outlined in a article in the Spring 2007 Journal which is available from the DOGA Shop.

The article includes a timetable which is downloadable below for you to base your efforts on.

Download the time table (Excel Spreadsheet)


This article was first published in the Spring2007 Double O Gauge Association Journal
All Material copyright the Double O Gauge Association
For more information visit our web site at www.doubleogauge.com